Fury Commences 2025 Drilling Program at the Éléonore South Gold Project

TORONTO, Feb. 03, 2025 (GLOBE NEWSWIRE) -- Fury Gold Mines Limited (TSX and NYSE American: FURY) (“Fury” or the “Company”) announces that a drill has been mobilized to the greenfield exploration Éléonore South gold project located in the Eeyou Istchee Territory in the James Bay region of Northern Quebec (Figure 1). Drilling will target robust multi-faceted geological, geophysical, and geochemical gold anomalies within the same sedimentary rock package that hosts the Éléonore Mine. The fully funded first phase drilling campaign will comprise approximately 4,000 – 6,000 metres (m) targeting an interpreted fold nose within the Low Formation sediments. Within the prospective folded stratigraphy are six undrilled priority targets spanning over 3 kilometres (km) of strike length that have been identified through a combination of biogeochemical sampling and interpretation of magnetics and electromagnetics survey data (Figure 2)(see news release dated November 12, 2024).

21 hours Ago


TORONTO, Feb. 03, 2025 (GLOBE NEWSWIRE) -- Fury Gold Mines Limited (TSX and NYSE American: FURY) (“Fury” or the “Company”) announces that a drill has been mobilized to the greenfield exploration Éléonore South gold project located in the Eeyou Istchee Territory in the James Bay region of Northern Quebec (Figure 1). Drilling will target robust multi-faceted geological, geophysical, and geochemical gold anomalies within the same sedimentary rock package that hosts the Éléonore Mine.

The fully funded first phase drilling campaign will comprise approximately 4,000 – 6,000 metres (m) targeting an interpreted fold nose within the Low Formation sediments. Within the prospective folded stratigraphy are six undrilled priority targets spanning over 3 kilometres (km) of strike length that have been identified through a combination of biogeochemical sampling and interpretation of magnetics and electromagnetics survey data (Figure 2)( see news release dated November 12, 2024 ). The first phase of drilling will be focussed within a northwest-southeast structural corridor where a strong correlation between anomalous gold, stratigraphy, and structure has been identified (Figure 2).

The drill targets occur in a structurally complex setting with little to no outcrop exposure and the targeting model will evolve with each hole drilled. The Company plans to complete approximately 15 of the 77 permitted drill holes as part of the first phase of drilling and will guide additional .

Copyright @ 2024 IBRA Digital